Sign In | Join Free | My uabig.com
China Sichuan Readycome Trading Co., Ltd. logo
Sichuan Readycome Trading Co., Ltd.
Ensure safe, stable, and efficient water use for the last five kilometers!
Verified Supplier

1 Years

Home > Prefabricated Pump Station >

GRP Compact Integrated Water Lift Station for Flood Control Sewage Solution

Sichuan Readycome Trading Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

GRP Compact Integrated Water Lift Station for Flood Control Sewage Solution

Price : usd 34215/sets 1-4 sets

Brand Name : readycome

Place of Origin : China

MOQ : 1 set

Payment Terms : D/A,D/P,T/T

Color : Customized

Usage : Wastewater collection and lift

Application : Machinery Repair Shops, Food & Beverage Factory, Farms, Restaurant, Home Use, Retail, Food Shop, Printing Shops, Construction works , Energy & Mining, Food & Beverage Shops, Other, Advert

Showroom : None

Warranty : 1 Year

Type : New tech

Weight : 3000kg

Power : Customized

Contact Now

GRP Compact Lifting Station New Design Integrated Water Pump Flood Control Sewage Solution

Core advantages

Highly integrated design: The factory prefabrication rate is as high as 90%, and the on-site installation cycle only takes 1-2 weeks (traditional pump station construction usually takes several months).
Intelligent management: supports unmanned operation mode, and real-time operation data (including traffic, energy consumption, fault status, etc.) can be viewed through remote monitoring system.
Green and environmentally friendly design: adopting an underground structure, effectively saving surface space, with operating noise below 60 decibels, meeting environmental protection requirements.
Outstanding durability: The fiberglass cylinder has excellent chemical corrosion resistance and a designed service life of over 30 years.

Compare Prefabricated pump station Traditional pump station
Construction period 1-14 days 3-6 months
Comprehensive cost Reduce 20% to 40% higher
Cover an area Reduce 30%~50% huge
Service life ≥ 30 years 15-20 years
Maintenance frequency Low High
Application
GRP Compact Integrated Water Lift Station for Flood Control Sewage Solution GRP Compact Integrated Water Lift Station for Flood Control Sewage Solution
Collection of rainwater in low-lying urban areas
Lake water circulation
GRP Compact Integrated Water Lift Station for Flood Control Sewage Solution GRP Compact Integrated Water Lift Station for Flood Control Sewage Solution
Renovation and expansion of the old pumping station
Urban sewage treatment plant sewage collection and transportation
GRP Compact Integrated Water Lift Station for Flood Control Sewage Solution
GRP Compact Integrated Water Lift Station for Flood Control Sewage Solution
Construction and renovation of municipal sewage pipe network
Sewage collection and transportation
in urban and rural areas
GRP Compact Integrated Water Lift Station for Flood Control Sewage Solution
GRP Compact Integrated Water Lift Station for Flood Control Sewage Solution
Water conveyance project
Hydraulic engineering
GRP Compact Integrated Water Lift Station for Flood Control Sewage Solution
GRP Compact Integrated Water Lift Station for Flood Control Sewage Solution
GRP Compact Integrated Water Lift Station for Flood Control Sewage Solution
Project
GRP Compact Integrated Water Lift Station for Flood Control Sewage Solution
GRP Compact Integrated Water Lift Station for Flood Control Sewage Solution
GRP Compact Integrated Water Lift Station for Flood Control Sewage Solution
GRP Compact Integrated Water Lift Station for Flood Control Sewage Solution
Why Choose Us
GRP Compact Integrated Water Lift Station for Flood Control Sewage Solution
GRP Compact Integrated Water Lift Station for Flood Control Sewage Solution
GRP Compact Integrated Water Lift Station for Flood Control Sewage Solution
GRP Compact Integrated Water Lift Station for Flood Control Sewage Solution

Product Tags:

Integrated Water Lift Station

      

GRP Water Lift Station

      

Compact Waste Water Lift Station

      
Wholesale GRP Compact Integrated Water Lift Station for Flood Control Sewage Solution from china suppliers

GRP Compact Integrated Water Lift Station for Flood Control Sewage Solution Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Sichuan Readycome Trading Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)